New Sluices

IMG_20180323_102351

The  middle ditch on our land at Nailsea moor has now been dammed, with a sluice gate at one end. This will allow us to control the water flow so we can maintain a higher water level [or lower] independent of the main drainage system.

IMG_20180323_103132

Further to the last post two of the nesting tubes on one of our ponds are in use, one has eggs in and another has a duck sitting.

Due to the weather the BASC wildfowling conference was cancelled this year.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s