The middle ditch on our land at Nailsea moor has now been dammed, with a sluice gate at one end. This will allow us to control the water flow so we can maintain a higher water level [or lower] independent of the main drainage system.
Further to the last post two of the nesting tubes on one of our ponds are in use, one has eggs in and another has a duck sitting.
Due to the weather the BASC wildfowling conference was cancelled this year.